Kitchen Remodel: Managing Demolition Debris - Fine Homebuilding

Sign up for eletters today and get the latest how-to from Fine Homebuilding, plus special offers.

A lot of thought and preparation goes into replacing an old kitchen. There are cabinets and countertops and flooring to choose and install, wiring to redo, lights to hang. But before that happens, the old kitchen has to go.

Demoing an old kitchen isn’t the hardest thing, but it takes forethought. As New Jersey remodeler Tyler Grace says in his “DIY Kitchen Demo” article in FHB #271, it’s a critical phase of the remodel. It’s not just about removing the old to make room for the new, but about keeping things neat and organized to make it easier to install the new. Still, there’s no getting around the fact that demolition is inherently messy work. Grace’s mess management is geared toward protecting the house and its occupants from the inevitable dust and debris, and making the most of his dumpster space.

[M52A0783] After all of the site protection is up and the demo begins, the debris piles up quickly. It’s tempting to get it all into the dumpster as soon as possible, but that’s not always the best approach. If there’s a dust barrier separating your work site from the rest of the house—like the wall of plastic sheeting and ZipWall poles Grace used in this project—he likes to keep the barrier closed as much as possible so that it can do its job. Keeping it closed, though, means coming up with a plan for storing the debris in the work site while the demo is underway.

Grace’s strategy is to stage a bunch of plastic trash cans inside the work site to hold debris while he demos. Anything that’s too big to fit in the cans gets neatly stacked. When he runs out of room, he moves the debris to the dumpster in as few trips as possible, minimizing the number of times he has to open his dust barrier and the transmission of airborne particles to the rest of the house.

[5M2A1116] Even if someone is strong enough to safely carry heavy demo debris, such as a nail-filled sheet of underlayment, all by themselves, Grace and his crew sometimes prefer to use two people, because that makes it easier to carefully navigate through doorways, down stairs, and other tricky spaces. Pairing up can also save you from having to make apologies and expensive repairs.

[5M2A0643] While it’s good practice to salvage materials for reuse, a lot of what gets demoed is bound to end up in the landfill during a remodel. That dumpster in the driveway seems big when it arrives, but it can fill up fast. When it’s to the point of spilling over, your options are to get another dumpster, which is expensive, or climb in and rearrange the trash to make room. It may be possible to avoid either of these scenarios by dumping the waste in an orderly way from the start. Grace breaks down cabinets into slabs and lays them flat in the dumpster to make the most of the space. Anything else with empty space gets the same treatment. If they have to, he and his crew will get in and rearrange the debris as they go. That’s a lot easier than trying to jam bits of old drywall and lumber into crevices in a nearly full dumpster.

Check out the full article, “DIY Kitchen Demolition,” in issue #271. Plus, read more of Tyler Grace’s demolition tips here:

  • Prepping for Demolition
  • Drywall Removal Made Easy

Photos by Brian McAward.

Get home building tips, offers, and expert advice in your inbox

×

Comments

Popular posts from this blog

Construction disputes were slightly less contentious last year

The resolution of global construction disputes remained steady in 2016, and the average time it took to resolve those disputes declined  bit, according to the seventh annual Arcadis Global Construction Disputes Report 2017, which is subtitled “Avoiding the Same Pitfalls.” This report reflects the construction disputes that Arcadis’ team handled around the world. The report infers that the roadblocks to expeditious and less cost dispute resolution often stem from the need for better contract administration, robust documentation, and a proactive approach to risk management. “Our industry contains the best problem solvers in the world,” the report states. “But there often seems to be a lack of ability or willingness of the project participants to compromise and resolve disputes at the earliest and most inexpensive stage possible.” Roy Cooper, Senior Vice President of Arcadis Contract Solutions, attributes disputes to “human emotions that can impede settlements, as they do with phys...

Quick turnaround: Partners HealtchCare

This administrative building, the largest in Somerville, Mass., consolidates 4,500 employees from 14 locations across Boston into one place. The project’s 30-month schedule was half of the typical time frame for such a building. So the Building Team had little margin for delays or mistakes. Twice-weekly meetings that included the client, AEC firms, and consultants were guided by seven core values that served as a roadmap during the design process. Once construction began, project leaders established a risk assessment group that identified and assessed potential problems weekly.  The building creates an “all-under-one-roof” organizational concept and culture, with a training center, multipurpose auditorium (available for use by campus residents, the local community, and the Partners’ network), community hubs, and outdoor spaces that include two acres of green space and walking paths. The facility is near a new subway stop, which connects the building to Somerville’s developing mix...

Green building advocates erect icehouses on Penn. state capitol steps to make point on codes

Advocates aiming to prompt Pennsylvania legislators to update the state’s building codes erected two icehouses on the steps of the state Capitol in Harrisburg to make a point about energy efficiency. One 8-foot-by-8-foot icehouse was built to current code; the other was built to passive house energy efficiency standards. In about three weeks, the project’s designers expect that the half-ton of ice in the less efficient shed will have melted completely, while the block in the high-performance building will still be about half of its original size. Pennsylvania has not updated its energy codes since 2009. Advocates also want state lawmakers to reform the process for adopting new codes. The Senate and House passed bills this spring to revise the state’s building code adoption process. A 2011 law requires an advisory board to approve each code change with a two-thirds vote. Interesting read originally from BDC Network