Skip to main content

Dover Project Feature: Contractor of the Year Award, First Place Bathroom Remodel - Dover Home Remodelers

August 24, 2017

Dover Project Feature: Contractor of the Year Award, First Place Bathroom Remodel

Dover Project Feature: Contractor of the Year Award, First Place Bathroom Remodel

BLOG #4 of 4 IN A SERIES

Our team at Dover was thrilled to be honored by NARI with a Contractor of the Year (CotY) Award for a bathroom renovation completed for our customer in Lakewood. Enjoy this final blog post by designer Amy Tilow that completes the project walkthrough…

This blog continues with product selections and final details…

LED tube lights were installed on a dimmer switch for clear, high-quality task lighting that can be softened to a subtle glow. A power strip inside the vanity keeps items plugged in and ready for use, yet hidden out of sight. Balance was created between the mirror and vanity by having the larger doors open in opposition to one another.

The skirted, sleek toilet—with a nightlight hidden in the seat—adds to the clean, modern design of the space.

Storage was a concern, so we took advantage of the 101” high ceiling by installing two 30” x 10” wall-mounted cabinets with top-hinged doors.  The cabinets were trimmed out with traditional crown molding, maintaining the integrity of this 1913 home.  Wide door casing and baseboards continue the look.

The new bathroom space strikes an even balance, respecting the past through use of classic materials and acknowledging the present with modern elements that reflect the homeowners’ personal tastes and design aesthetic.  And it’s a far cry from the demoed space the couple had been living with for years.

This project was very challenging—and also very fulfilling. I’m so proud that it won a CotY award! That was just icing on the cake. I hope you’ve enjoyed following along through the project blog.

Best,

Amy Tilow

Comments

Popular posts from this blog

Construction disputes were slightly less contentious last year

The resolution of global construction disputes remained steady in 2016, and the average time it took to resolve those disputes declined  bit, according to the seventh annual Arcadis Global Construction Disputes Report 2017, which is subtitled “Avoiding the Same Pitfalls.” This report reflects the construction disputes that Arcadis’ team handled around the world. The report infers that the roadblocks to expeditious and less cost dispute resolution often stem from the need for better contract administration, robust documentation, and a proactive approach to risk management. “Our industry contains the best problem solvers in the world,” the report states. “But there often seems to be a lack of ability or willingness of the project participants to compromise and resolve disputes at the earliest and most inexpensive stage possible.” Roy Cooper, Senior Vice President of Arcadis Contract Solutions, attributes disputes to “human emotions that can impede settlements, as they do with phys...

Quick turnaround: Partners HealtchCare

This administrative building, the largest in Somerville, Mass., consolidates 4,500 employees from 14 locations across Boston into one place. The project’s 30-month schedule was half of the typical time frame for such a building. So the Building Team had little margin for delays or mistakes. Twice-weekly meetings that included the client, AEC firms, and consultants were guided by seven core values that served as a roadmap during the design process. Once construction began, project leaders established a risk assessment group that identified and assessed potential problems weekly.  The building creates an “all-under-one-roof” organizational concept and culture, with a training center, multipurpose auditorium (available for use by campus residents, the local community, and the Partners’ network), community hubs, and outdoor spaces that include two acres of green space and walking paths. The facility is near a new subway stop, which connects the building to Somerville’s developing mix...

Green building advocates erect icehouses on Penn. state capitol steps to make point on codes

Advocates aiming to prompt Pennsylvania legislators to update the state’s building codes erected two icehouses on the steps of the state Capitol in Harrisburg to make a point about energy efficiency. One 8-foot-by-8-foot icehouse was built to current code; the other was built to passive house energy efficiency standards. In about three weeks, the project’s designers expect that the half-ton of ice in the less efficient shed will have melted completely, while the block in the high-performance building will still be about half of its original size. Pennsylvania has not updated its energy codes since 2009. Advocates also want state lawmakers to reform the process for adopting new codes. The Senate and House passed bills this spring to revise the state’s building code adoption process. A 2011 law requires an advisory board to approve each code change with a two-thirds vote. Interesting read originally from BDC Network