Skip to main content

Dover Project Feature: Contractor of the Year Award, First Place Bathroom Remodel - Dover Home Remodelers

August 17, 2017

Dover Project Feature: Contractor of the Year Award, First Place Bathroom Remodel

Dover Project Feature: Contractor of the Year Award, First Place Bathroom Remodel

Guest Blog: Designer Amy Tilow

BLOG #3 of 4 IN A SERIES

Our team at Dover was thrilled to be honored by NARI with a Contractor of the Year (CotY) Award for a bathroom remodel completed for our customer in Lakewood. Enjoy part 3 of this guest blog series by designer Amy Tilow that takes you on a project walkthrough, with details about this historic home renovation… 

Continuing from my post last week….

The original bathroom design featured a pedestal sink to keep with the historic profile of the home—but when we met for plumbing selections, the husband saw a floating vanity in the showroom and decided they had to have it. That single piece was the impetus for the entire design, leading us to the faucet with its dynamic shape and a polished chrome finish. A frameless, hinged glass panel door was used on the tub/shower to give the room a light, open feel.

When it came to selecting materials, we selected materials that echoed the home’s heritage, like traditional white subway tile, but then updated the look to a larger 4” x 12” format.  We also added personal touches to make the space unique: Aqua is the wife’s favorite color, which was incorporated in glass subway accent tiles and in the sink faucet handles.

The husband is fond of Carrera marble, so we chose a 12” x 24” porcelain floor tile that looked like marble—only at a much lower price point—and set it in a brick pattern.  We then used actual Carrera marble in several applications—the window sill, shower niche shelves and created a custom top to cover the radiator, which also doubles as a furniture/decor element in the room.

By paying close attention to what functions best within the space and what appeals to the homeowners’ tastes, we were able to create a smart, functional bathroom that is uniquely theirs.

Next week, I’ll walk you through the final project details!

Best,

Amy Tilow

Comments

Popular posts from this blog

Construction disputes were slightly less contentious last year

The resolution of global construction disputes remained steady in 2016, and the average time it took to resolve those disputes declined  bit, according to the seventh annual Arcadis Global Construction Disputes Report 2017, which is subtitled “Avoiding the Same Pitfalls.” This report reflects the construction disputes that Arcadis’ team handled around the world. The report infers that the roadblocks to expeditious and less cost dispute resolution often stem from the need for better contract administration, robust documentation, and a proactive approach to risk management. “Our industry contains the best problem solvers in the world,” the report states. “But there often seems to be a lack of ability or willingness of the project participants to compromise and resolve disputes at the earliest and most inexpensive stage possible.” Roy Cooper, Senior Vice President of Arcadis Contract Solutions, attributes disputes to “human emotions that can impede settlements, as they do with phys...

Quick turnaround: Partners HealtchCare

This administrative building, the largest in Somerville, Mass., consolidates 4,500 employees from 14 locations across Boston into one place. The project’s 30-month schedule was half of the typical time frame for such a building. So the Building Team had little margin for delays or mistakes. Twice-weekly meetings that included the client, AEC firms, and consultants were guided by seven core values that served as a roadmap during the design process. Once construction began, project leaders established a risk assessment group that identified and assessed potential problems weekly.  The building creates an “all-under-one-roof” organizational concept and culture, with a training center, multipurpose auditorium (available for use by campus residents, the local community, and the Partners’ network), community hubs, and outdoor spaces that include two acres of green space and walking paths. The facility is near a new subway stop, which connects the building to Somerville’s developing mix...

Green building advocates erect icehouses on Penn. state capitol steps to make point on codes

Advocates aiming to prompt Pennsylvania legislators to update the state’s building codes erected two icehouses on the steps of the state Capitol in Harrisburg to make a point about energy efficiency. One 8-foot-by-8-foot icehouse was built to current code; the other was built to passive house energy efficiency standards. In about three weeks, the project’s designers expect that the half-ton of ice in the less efficient shed will have melted completely, while the block in the high-performance building will still be about half of its original size. Pennsylvania has not updated its energy codes since 2009. Advocates also want state lawmakers to reform the process for adopting new codes. The Senate and House passed bills this spring to revise the state’s building code adoption process. A 2011 law requires an advisory board to approve each code change with a two-thirds vote. Interesting read originally from BDC Network