When new energy codes requiring continuous insulation for the building envelope were adopted by the state of North Carolina, the developers of the recently opened Asheville City Center sought out a cost-effective design that met code requirements while still allowing the building to feel open from the outside.

Architects chose tall, thin windows that let light in and prioritized energy efficiency. Spacing the windows evenly apart and flush with the rest of the building’s envelope gave the windows an interesting staggered pattern. Recessing them by three inches provided the building with a sense of depth and dimension.

The architectural team considered insulated metal panels, but for this mid-scale project, ALPOLIC®’s practical, versatile materials proved the better fit for both their vision and their budget.

“With the insulated panels, it’s not cost effective to have many different widths,” architect Aaron Brumo of design firm Clark Nexsen explains. “But with ACM, we could have 100 different size panels if we wanted to. Plus, the panels were available in a wide selection of stock ALPOLIC colors.” 

Complex Design, Simple Construction, Minimal Cost

The materials were installed using the innovative R-Trac HVHZ pressure-equalized rainscreen system, developed through a collaboration between Mitsubishi Chemical Composites America, Rmax, and Altech Panel Systems. 

In compliance with the latest energy efficiency codes, the R-Trac system works with continuous insulation. It is specifically designed to meet wind loading and missile impact standards for high velocity hurricane zones, and meets the NFPA 285 standard for limiting fire propagation. 

Doug McIntyre, director of research and business development at Altech Panel Systems and the fabricator of this project’s R-Trac system, notes that one advantage of a continuous insulation system with an R-Trac rainscreen is that it’s an all-inclusive system. This reduces costs by eliminating the need to have multiple trades on site. 

A Perfect Combination

The R-Trac system and ALPOLIC® materials are the perfect marriage of innovative materials and design engineering. Of the R-Trac system, Brumo says: “It really simplifies the design, the assembly of the skin.”

McIntyre notes that ALPOLIC® materials pair perfectly with his company’s innovative rainscreen system.  “We’ve been using ALPOLIC® materials for years,” he says.  “We’ve always felt they have a very good product.  Their colors are, we feel, superior to others in the industry. Quality and service, they’re A-number one.”

Comments

Popular posts from this blog

Construction disputes were slightly less contentious last year

The resolution of global construction disputes remained steady in 2016, and the average time it took to resolve those disputes declined  bit, according to the seventh annual Arcadis Global Construction Disputes Report 2017, which is subtitled “Avoiding the Same Pitfalls.” This report reflects the construction disputes that Arcadis’ team handled around the world. The report infers that the roadblocks to expeditious and less cost dispute resolution often stem from the need for better contract administration, robust documentation, and a proactive approach to risk management. “Our industry contains the best problem solvers in the world,” the report states. “But there often seems to be a lack of ability or willingness of the project participants to compromise and resolve disputes at the earliest and most inexpensive stage possible.” Roy Cooper, Senior Vice President of Arcadis Contract Solutions, attributes disputes to “human emotions that can impede settlements, as they do with phys...

Quick turnaround: Partners HealtchCare

This administrative building, the largest in Somerville, Mass., consolidates 4,500 employees from 14 locations across Boston into one place. The project’s 30-month schedule was half of the typical time frame for such a building. So the Building Team had little margin for delays or mistakes. Twice-weekly meetings that included the client, AEC firms, and consultants were guided by seven core values that served as a roadmap during the design process. Once construction began, project leaders established a risk assessment group that identified and assessed potential problems weekly.  The building creates an “all-under-one-roof” organizational concept and culture, with a training center, multipurpose auditorium (available for use by campus residents, the local community, and the Partners’ network), community hubs, and outdoor spaces that include two acres of green space and walking paths. The facility is near a new subway stop, which connects the building to Somerville’s developing mix...

Green building advocates erect icehouses on Penn. state capitol steps to make point on codes

Advocates aiming to prompt Pennsylvania legislators to update the state’s building codes erected two icehouses on the steps of the state Capitol in Harrisburg to make a point about energy efficiency. One 8-foot-by-8-foot icehouse was built to current code; the other was built to passive house energy efficiency standards. In about three weeks, the project’s designers expect that the half-ton of ice in the less efficient shed will have melted completely, while the block in the high-performance building will still be about half of its original size. Pennsylvania has not updated its energy codes since 2009. Advocates also want state lawmakers to reform the process for adopting new codes. The Senate and House passed bills this spring to revise the state’s building code adoption process. A 2011 law requires an advisory board to approve each code change with a two-thirds vote. Interesting read originally from BDC Network