Hurricane resistant, energy-efficient Viracon Glass turns Florida office building into modern business destination

Emerald Hills Executive Plaza One (now known as Ganot Plaza), located in Hollywood, Florida, was in desperate need of an overhaul. The 40-year-old building was encased with glass that used an inconsistent film, which struggled to keep sunlight out. In a highly competitive market, the property owner desired an upgrade to improve not only the building’s looks, but its comfort and performance, which resulted in faster leasing rates for the investment.

THE BUILDING: The Ganot Plaza is a 63,342-square-foot, six-story mid-rise office building. To give the building a sleek, modern, contemporary look and feel, the building received a major curtain wall retrofit.

SOLUTION: For this project, there was one clear choice -- energy-efficient VUE-30, one of Viracon’s highest performing coated glass. Working with a 28,000-square-foot curtain wall system, VUE-30 not only transformed the drab 40-year-old Emerald Hills office building into a modern marvel, but enhanced the energy efficiency of the building.

BENEFITS: In today’s tightening energy code environment, designers and developers have been demanding a low-emissivity coating with exceptional performance (a Solar Heat Gain Coefficient (SHGC) of less than .20). To meet that need, Viracon developed the VUE line of glass coatings, which offers the opportunity to maximize window-to-wall ratio while maintaining performance that exceeds current domestic energy code requirements. Viracon VUE-30 provides natural daylight while reducing potential glare; balancing light with energy savings and low U-V transmittance. VUE-30 has superior solar performance with a Solar Heat Gain Coefficient (SHGC) of .18 and Visible Light Transmittance (VLT) of 31% on clear glass resulting in an LSG of 1.72. VUE-30’s solar performance is complimented by a transparent appearance that designers have been asking for.

THE PLAYERS: Architect, Iraj S. Shojaie; General Contractor, Burke Construction; Curtain Wall Manufacturer and Contractor, Crawford-Tracey Corp.; Glass Fabricator, Viracon Inc.

 Visit viracon.com

Comments

Popular posts from this blog

Construction disputes were slightly less contentious last year

The resolution of global construction disputes remained steady in 2016, and the average time it took to resolve those disputes declined  bit, according to the seventh annual Arcadis Global Construction Disputes Report 2017, which is subtitled “Avoiding the Same Pitfalls.” This report reflects the construction disputes that Arcadis’ team handled around the world. The report infers that the roadblocks to expeditious and less cost dispute resolution often stem from the need for better contract administration, robust documentation, and a proactive approach to risk management. “Our industry contains the best problem solvers in the world,” the report states. “But there often seems to be a lack of ability or willingness of the project participants to compromise and resolve disputes at the earliest and most inexpensive stage possible.” Roy Cooper, Senior Vice President of Arcadis Contract Solutions, attributes disputes to “human emotions that can impede settlements, as they do with phys...

Quick turnaround: Partners HealtchCare

This administrative building, the largest in Somerville, Mass., consolidates 4,500 employees from 14 locations across Boston into one place. The project’s 30-month schedule was half of the typical time frame for such a building. So the Building Team had little margin for delays or mistakes. Twice-weekly meetings that included the client, AEC firms, and consultants were guided by seven core values that served as a roadmap during the design process. Once construction began, project leaders established a risk assessment group that identified and assessed potential problems weekly.  The building creates an “all-under-one-roof” organizational concept and culture, with a training center, multipurpose auditorium (available for use by campus residents, the local community, and the Partners’ network), community hubs, and outdoor spaces that include two acres of green space and walking paths. The facility is near a new subway stop, which connects the building to Somerville’s developing mix...

Green building advocates erect icehouses on Penn. state capitol steps to make point on codes

Advocates aiming to prompt Pennsylvania legislators to update the state’s building codes erected two icehouses on the steps of the state Capitol in Harrisburg to make a point about energy efficiency. One 8-foot-by-8-foot icehouse was built to current code; the other was built to passive house energy efficiency standards. In about three weeks, the project’s designers expect that the half-ton of ice in the less efficient shed will have melted completely, while the block in the high-performance building will still be about half of its original size. Pennsylvania has not updated its energy codes since 2009. Advocates also want state lawmakers to reform the process for adopting new codes. The Senate and House passed bills this spring to revise the state’s building code adoption process. A 2011 law requires an advisory board to approve each code change with a two-thirds vote. Interesting read originally from BDC Network